C.E. Electronics
Master Programmer

Master Programmer

SURXTX
Made to order · lead time on request

Our SURXTX Security Manager provides a convenient PC-based interface for configuring and maintaining C.E. Electronics security systems. Supplied with Windows software, it allows existing users to be viewed and managed, access codes changed and system timing settings adjusted.

The SURXTX connects to the security system using a USB to RS485 interface and supports memory copy and transfer functions, making it easier to duplicate or update configurations across multiple systems. It provides a simpler option for installations where user access needs to be managed regularly or in larger numbers.

Request a quote
Documentation
PDFDatasheet↓
TypeSecurity system programmer
FunctionPrograms C.E. security access systems
ApplicationNew install · Modernisation

Control which floors a car serves.

Keypad and card-reader access systems that secure individual landings through relay-isolated outputs, set up from a single handheld programmer.

Landing control
Secure one or many floors.
Relay-isolated
Disables the landing in-circuit.
Keypad or card
Choose the access method.
Programmable
Set up from the handheld programmer.

Technical specification

TypeSecurity system programmer
FunctionPrograms C.E. security access systems
ApplicationNew install · Modernisation

Connects directly to the SEC boards.

The Security Manager is not wired into the landing circuits. It connects directly to the SEC security board over its USB to RS485 interface, and the specific connections are detailed in the wiring diagram for the relevant SEC board.

Stuck on a connection or signal type? Talk to technical support.

Master Programmer wiring diagram